production
Main projects
Hall No. 1
Projects in the hall number 1 include: manufacture of steering wheels, their coating with leather, manufacture of brake hoses, fuel tank caps fuel and break systems or engine covers.
Hall No. 2
The second hall is focused on manufacture of airbags (front, knee, side, curtain and for fellow traveller) and steeling pillar covers.